Request a quotation [email protected]

German industrial supply for MERCOSUR

MN-F is the Division LATAM of STA Technic, which has supplied industry in Europe and the Middle East for more than 25 years. Whether you need one critical component, a complete BOM, an emergency replacement or a hard-to-find legacy part, MN-F starts with the technical requirement and builds the supply route from Germany to your destination in Latin America.

Use the arrow keys to turn the model, plus and minus to zoom, Home to reset.

What MN-F sources, and from whom

MN-F works with manufacturers, authorized distributors and established industrial stock suppliers on the German market. The manufacturers listed are the ones MN-F sources from most; items from other manufacturers are quoted on request. The sourcing channel, item condition, country of origin and available documentation are identified in the quotation.

Automation and microcontrollers

PLC, microcontrollers, sensors and controls.

  • Siemens Industrial automation systems and components (main supplier)
  • Rockwell Automation Industrial automation solutions
  • ProEltec Control panels and operator consoles
  • Dell Industrial servers, computers and displays

Industrial equipment

Machinery, drives and plant components.

  • Rittal Industrial enclosures and control cabinets
  • Cortem Ruggedized and explosion-proof enclosures
  • Lapp (LappKabel) Cables and wiring
  • Helukabel Cables and wiring

Precision tools and instruments

Metrology, cutting tools and instruments.

  • Dräger Measuring instruments
  • Galltec + Mela Humidity sensors and measurement devices
  • AMETEK Land Optical measurement equipment

Manufacturing consumables

Wear parts, tooling and production supplies.

Sourced on request against your specification.

Choose your procurement route

One request can be a single part number or a complete equipment list. Each route below says what to send and what the quotation identifies.

  1. Standard RFQ

    For individual components, instruments, automation equipment, cables, cabinets, spare parts and other industrial items.

  2. RFQ and BOM procurement

    For production lines, plant expansions, automation projects, maintenance programmes and complete equipment packages. You can receive one consolidated commercial proposal from MN-F instead of managing several international supply channels.

  3. Emergency replacement

    Production-critical requests are treated as priority sourcing cases: we search the German market for the fastest viable supply route for the failed unit.

  4. Obsolete and hard-to-find equipment

    Some industrial components remain in service long after the manufacturer has discontinued them. We investigate obsolete part numbers, legacy automation components, previous-generation HMI, PLC and drive components, new old stock and remaining German inventory.

  5. Engineering alternative

    When the requested item is unavailable, discontinued or commercially impractical, we investigate a technically equivalent alternative. It is quoted separately and supplied only after your approval.

How procurement works, in full

From technical requirement to delivery

  1. Step 1: Request

    You send the RFQ, BOM, part number, technical specification or nameplate photograph, with the destination.

  2. Step 2: Technical and sourcing review

    We check the requirement against available German market sources: part number, datasheet, availability and lead time.

  3. Step 3: Quotation

    You receive a written commercial proposal: specification, price, lead time, Incoterm and named place.

  4. Step 4: Order confirmation

    MN-F confirms the agreed scope in writing. Any subsequent change is confirmed in writing.

  5. Step 5: Verification and export preparation

    MN-F performs the agreed verification procedure and documents the result in the verification report before dispatch.

  6. Step 6: Germany to Latin America

    We coordinate the agreed delivery route to the destination by air, road, sea, multimodal transport or courier.

Every step in detail

Delivery terms and documents

Delivery terms are quoted under Incoterms 2020 with the named place. Freight is booked by air, road, sea, multimodal transport or, for urgent components, courier.

Typical delivery structures are FCA Germany, CPT destination, CIP destination and DAP plant or agreed destination. Other Incoterms can be agreed when appropriate for the project.

For Latin American imports, the importer remains responsible for local import clearance, duties and taxes unless a different arrangement is explicitly agreed.

Delivery structures in detail

Depending on the product and destination, the shipment documents may include a commercial invoice, packing list, transport document and manufacturer datasheet. The exact document package is defined for each order.

The document package

Verification before dispatch

Before dispatch, MN-F performs the verification procedure agreed in the quotation. The result is documented in a verification report for that order.

The report records an internal procedure of MN-F; it is not a UVV safety inspection and does not replace manufacturer or notified-body certification. A sample report is available on request.

The verification report

One German sourcing point

You do not need to manage separate sourcing channels for every manufacturer. MN-F can consolidate requirements across multiple German manufacturers, distributors and industrial stock suppliers into one commercial and logistics process: one RFQ, one sourcing partner, one consolidated quotation and one coordinated shipment.